Precautions for ppr pipe during installation of pipe fittings.

Mar. 20, 2021
What are the precautions for ppr pipe in the process of pipe fittings installation?

The normal use of ppr pipe fittings is inseparable from the correct and standardized installation. As a professional ppr pipe fitting manufacturer, ppr pipe manufacturers need to better regulate their own installation technology. First fix the wiring, and then slot into the ground. I think it’s better to let the plumber do it. After all, the plumber’s staff are more professional, so it won’t be great if the water pipes you connect to it leaks.

From the connection of PPR pipes: hot-melt connection. The melting temperature is 260 degrees. Your installation scale should refer to your design scale. This has to be designed according to your home improvement. Generally, PPR cannot be exposed to the surface. The first surface-mounted PPR will be deformed by gravity, and the second surface-mounted PPR will easily age. Third, if it is a white PPR, it can easily transmit light to form breeding bacteria. So it is recommended to bury it in secret. PPR water pipes can also be connected by hot-melt sockets. The pipes and pipe fittings are completely integrated, and the strength of the joints even exceeds the strength of the pipe body. As long as the construction is properly performed, it will pass the pressure test after completion, and the performance is extremely high.

Precautions for ppr pipe during installation of pipe fittings:

?1. The pressure test can be more than 30 minutes. If the site environment permits, the pressure test time can be longer.

?2. The purchase of ppr pipes and fittings must be guaranteed and must be operated by professionally trained technical workers.

?3. According to the horizontal, horizontal and vertical principle, a deep groove larger than the diameter of the water pipe should be grooved on the basic floor of the room, and then ppr pipe fittings should be laid, followed by sequential hot-melt connection. The process flow is very important.

4. After all ppr pipe fittings are fused together with hot melt technology, the necessary pressure strength test is carried out.

?5. The hot-melt technology is finalized after cooling. It is not that the longer the time, the better. Long-term pressure will damage the water pipe. When it is ensured that there is no leakage of water, then landfill is carried out.

Special attention should be paid to the appearance of ppr pipe welding, and non-destructive testing can only be carried out after the appearance inspection is qualified. Radiographic flaw detection shall be carried out on pipe welds that cross rivers, reservoirs, roads, railways, underground pipelines, cables, and optical cables, welds between straight pipes and elbows, and joints after pressure test.
返回頂部
CLOSE
主站蜘蛛池模板: 欧美喷潮久久久XXXXX | 日韩精品成人网 | 99久久精品国产一区二区成人 | 看国产成人h片视频 | 在线国产福利 | 欧美最猛性xxxxx亚洲精品 | 国产精品免费看久久久软件 | 亚洲一区二区三区精品动漫 | 永久中文字幕免费视频网站 | 国产成人精品在线观看 | 国产亚洲精品久久久久久老妇 | 免费一区二区三区视频导航 | 一区二区三区中文字幕在线 | 日韩一区免费在线观看 | www.99视频| 亚洲日韩日本中文在线 | 日韩高清片 | 99久久免费国产精品四虎 | 精品特级毛片 | 粉嫩蜜臀av国产精品网站 | 亚洲乱码无人区卡1卡2卡3 | 久久大全 | 国模两腿玉门打开图无码 | 白嫩无码人妻丰满熟妇啪啪区百度 | 久久久国产亚洲精品 | 亚洲成av人影片在线观看 | 国产精品久久久久久不久 | 一区二区三区无码按摩精油 | 免费视频一区 | 国产粉嫩大学生16高清专区 | 三年片在线观看大全 | av大片在线免费观看 | 久久久久久成人 | A级毛片高清免费视频在线播放 | 国产无遮挡又黄又爽网站 | 亚洲VA在线∨A天堂VA欧美VA | 一二三四日本高清社区5 | 伊人涩涩涩涩久久久AV | 99久久精品国产交换 | 久久久久久久久久久久中文字幕 | 大地资源网高清在线观看 |