We not only need to buy high-quality pvc water supply and drainage pipes, but also have good installation techniques and measures, so as to reflect the work effect of pvc water supply and drainage pipes. Some people say that the service life of water supply and drainage pipes is very short after they have been bought many times. They all attribute the reason to the quality of the products produced by the pvc water supply and drainage pipe manufacturers. In fact, it is not the case, and some are because the installation process is not in place and incorrect. As a result, the service life of the water supply and drainage pipes is shortened. How to install the pipes so as not to damage the pipes? The pipeline technicians will introduce to you:
The correct installation method of pvc drainage pipe:
(1) The sewage adopts PVC-U core layer foamed drainage pipe, glued and flanged joints.
(2) According to the requirements of the drawings, combined with the actual situation, measure the size according to the position of the reserved port, and draw the processing sketch
(3) Measure the size of the pipe according to the sketch and break the pipe. The fracture should be flat, use a file or a scraper to remove the spurs inside and outside the fracture, and file a 15°C angle on the outer edge.
(4) Before bonding, the socket should be inserted into the test first, not all insertion, generally 3/4 of the depth of the socket, after the test insertion is qualified, wipe off the moisture and dust of the socket to be bonded with a cotton cloth. If there is oil, acetone is needed to remove it. Apply the adhesive with a brush, first apply the socket and then the socket, and then insert it vertically. When inserting and bonding, rotate the socket slightly to facilitate uniform distribution of the adhesive, and the bonding will be firm in about 30-60 minutes.
(5) When installing plastic drainage pipes, lead wire can be used for temporary hanging for pre-installation, adjust the spout coordinates, position, pipe elevation, and slope to meet the design requirements for bonding, and timely correct the spout coordinates and elevation slope. After the bonding is solidified, install the fixed support, but it is not advisable to fasten it too tightly. When using a metal bracket, a rubber gasket must be put in contact with the outer diameter of the pipe.
(6) The lowest and highest floor of the drainage standpipe should be equipped with inspection openings, and the center of the inspection opening should be 1.0m away from the ground.
(7) After the pipe is installed, the pipe hole should be blocked in time, and the pipe should be blocked according to the requirements of the specification. The pipe after installation is strictly prohibited from climbing or borrowing for other purposes.
According to the above installation method, the purpose of normal operation of the drainage pipe can be realized, and the normal service life of the PVC drainage pipe can be guaranteed.
But we also need to remind that we must also do a good job of protection during the use of the pipeline, and prohibit strong activities such as trampling or smashing.
If you are interested in PVC Drainage System,You can browse related products and initiate consultations on our website.
返回頂部
CLOSE
主站蜘蛛池模板: 97视频网站 | 中国人与拘一级毛片 | 少妇富婆一区二区三区夜夜 | 99热九九这里只有精品10 | 免费毛片免费看 | 亚洲s色大片在线观看 | 海角国精产品一区一区三区糖心 | 无码国产午夜福利片在线观看 | 偷拍成人一区亚洲欧美 | 女人19毛片一级毛片 | 日日夜夜2017 | 亚洲国产成人久久综合一区久久久国产99 | 亚洲国产精品无码久久久不卡 | 国内精品久久久久久久影视麻生 | 亚洲精品乱码久久久久久国产主播 | 最新精品视频2019在线视频 | 精品国产乱码久久久久久影片 | 亚洲国产在 | 国产干干| 欧美日日操 | 看亚洲毛片 | www.黄色国产 | 亚洲AV无码国产精品色软件下戴 | 亚洲AV片不卡无码久久wy193 | 啦啦啦中文在线视频免费观看 | 天天爽夜夜爽人人爽 | 国产成人精品亚洲日本在线桃色 | 国内精品国产三级国产在线专 | 亚洲AV无码精品色午夜果冻不卡 | 另类一区 | 九九九九九少妇爽黄大片 | 女人找男人皮日日视频 | 调教女m屁股撅虐调教 | 中文字幕按摩做爰 | 成人高清一区 | av片网站在线观看 | 天天摸天天碰天天添 | 啊灬啊灬轻点第一次和外国人 | 国产亚洲一级高清 | 国产精品久久久久av福利游戏 | 久久亚洲精中文字幕西条琉璃 |